E7018 Preparation Before Welding

E7018 Preparation Before Welding

Base Metal and Groove Preparation Before Welding Requirements for Base Metal Cleanliness E7018 electrodes are extremely sensitive to impurities on the base metal surface (oil, rust, moisture, scale, paint, etc.), which can cause weld porosity, slag inclusion, or hydrogen-induced cracks....
Send Inquiry
Product Introduction

 

Base Metal and Groove Preparation Before Welding

Requirements for Base Metal Cleanliness
E7018 electrodes are extremely sensitive to impurities on the base metal surface (oil, rust, moisture, scale, paint, etc.), which can cause weld porosity, slag inclusion, or hydrogen-induced cracks.

Mechanical grinding (wire brush, angle grinder) or chemical cleaning (acetone, alcohol) must be used to remove all impurities from the groove and at least 20mm on both sides until the metallic luster is exposed.

If the base metal is damp (e.g., after rain or in high-humidity environments), it must be dried with a flame (temperature 50~80℃) and cooled to room temperature before welding.

Groove Design and Machining

For base metals with thickness >6mm, grooves (e.g., V-type, U-type) must be prepared to ensure full penetration. The groove angle is typically 60°±5°, with a root face thickness of 1~2mm and a gap of 2~3mm (adjusted based on welding position).

Groove edges must be free of cracks, laminations, or other defects. Burrs and flash must be removed after machining to avoid arc instability.

Hot Tags: e7018 preparation before welding, China, manufacturers, suppliers, factory, company, wholesale, discount, buy, low price, high quality, products

Send Inquiry

whatsapp

Phone

E-mail

Inquiry