Aug 17, 2026 Leave a message

What Are The Best Practices For ER80S-B2 High Temperature Welding?

High-temperature welding presents unique challenges that require specialized knowledge and proper techniques. ER80S-B2 welding wire has emerged as a preferred solution for critical applications in power plants and petrochemical facilities.

 

Understanding Preheat Requirements
Proper preheating is essential when working with ER80S-B2. The minimum preheat temperature should be 130-180°C, with thicker sections requiring at least 150°C. This prevents cold cracking and ensures optimal weld quality.

 

Shielding Gas Selection
For TIG welding applications, pure argon provides the best results. When using MIG processes, consider Ar+1-5% O₂ mixtures or 80% Ar + 20% CO₂ blends. Proper gas flow rates between 20-25 L/min ensure adequate protection.

 

Post-Weld Heat Treatment
After welding, ER80S-B2 requires post-weld heat treatment at 600-650°C for 1-2 hours. This process relieves residual stresses and optimizes the microstructure for long-term performance.

 

Quality Control Measures
Implement rigorous quality control procedures including visual inspection, non-destructive testing, and mechanical property verification. These steps ensure compliance with AWS A5.28 standards and project specifications.



 

Send Inquiry

whatsapp

Phone

E-mail

Inquiry